Having 20 years rich and varied hands on/technical and managerial experience, within the oil and gas and engineering industry on/off shore environments, involving the following: desert and high risk environments, some with extreme and challenging working environments, whilst providing full asset assurance and compliance with legislation, HSE, and company policy. Working to standards and procedures, engineering codes, codes of practice, utilizing MS/Primavera P6 project, P&IDs, PFDs, isometrics, line diagrams, technical drawings and information management systems. Producing and working to risk assessment and PTW, generating technical reports and procedures, progress tracking and working to schedules, producing update reports, Clear understanding of process plant, discipline skills and the application of safety management to the workplace and personnel, Directly involved in LNG and gas sweetening ,LPG, NGL & Oil refineries (DGS,CPF) & Thermal power plant (combined cycle) as a Lead construction manager and project engineer, site construction manager & maintenance construction Manager /construction readiness Manager, experience in large welded storage tanks and pressure vessels (LPG spherical tank &LNG cryogenic full containment tanks/ cylindrical vessels) and process & power piping & export pipelines & flow lines & GRE & GRP piping (nonmetallic) ,Familiar with processing of oil refineries and gas plant , Familiar in pre commissioning and mechanical completion , Able to preparing NDT procedure and ITPs and making WPS for different kind of CS ,A.S ,S.S, Familiar and experienced in construction fixed mechanical equipment and preparing method statements for them, Familiar to interpretation of RT industrial films and evaluate acceptance or rejection, Familiar with industrial painting and coating application and preparing method statement and test procedure for painting application.
1. EPC contractor's mechanical construction representative and follow up Mechanical and Electrical equipment installation (Fabrication & erection & testing & pre- commissioning)
2. Attending in kick off meeting with client to present execution plan.
3. Preparing method statements for construction mechanical parts
4. Preparing fabrication and erection procedure of the project and getting approval of the client
5. Managing preparation of material take off and request to receive material required for starting construction
6. Managing the multi discipline construction team of EPC contractor (civil/mechanical/electrical/instrumentation)
7. Preparing Monthly report and sending to project manager
8. Preparing 8 weeks -Look ahead Plan and following up execution
9. Site supervision of construction group and identify problems and shortage and sorting out the issues.
10. Reporting any shortage to project manager and interfacing between material department and located engineering team in the construction site and procurement and logistic tea.
11. Estimating manpower required to execute project in timely manner
12. Leading the execution of hydrostatic test for the piping system.
13. Enforcing quality requirement of the project to the construction team.
14. Producing look ahead plan for the mechanical activities weekly basis.
15. Supervising the mechanical team to execute the project free from incident.
16. Supervising mechanical punch clearance prior to commissioning.
17. Managing preparation of mechanical completion dossier for each system and subsystem of project.
18. Signing MCC (Mechanical completion certificate) and clearing document punch of the dossiers.
19. Supervising the execution of leak test of the systems.
20. Ensure all works are undertaken in-line with the Quality Management system.
21. Managing quality control and quality engineers involved in developing and the execution of systems, products or services to ensure they are designed and produced to meet client requirements and expectations. Quality Assurance covered design, development, production, installation, commissioning, sub-contractor servicing, documentation and certification.
22. Leading quality control and quality assurance in modification and designs, ensuring they conform to international standards, codes, practices.
23. Identify problems in the management of quality systems and propose and implement solutions.