Rehabilitated Khartoun North Power Station to operate at its maximum capacity
Supervised the implementation of the advance payment system project at the National Electricity Corporation.
Built and established most of the customer service offices at the National Electricity Corporation.
Reduced commercial and technical electricity losses from 43% to 18%.
Participated in developing the Corporation's short-term plan from 2005 to 2010 to increase generation to 5,000 megawatts.
Participated in developing the National Electricity Corporation's long-term plan from 2005 to 2030.
Participated in the committee for connecting the Merowe Dam project network to the national grid.
We won the President's Quality Award as the best public administration in Sudan.
Rehabilitated Heglig electricity grid and power station in just ten days after they were destroyed following their liberation by the Sudanese army when they were occupied by the government of South Sudan.
Formed rehabilitation team of Sudanese experts to rehabilitate Power generation stations in oil fields, replacing contracts with foreign companies and saving $1 million annually.
Planned and implemented an RTU project to monitor producing oil wells.
Reduced oil deferment due to power outages to a minimum after implementing a system monitoring and control program.
Manager Power Plant Department, Exploration & Production Division (GNPOC) with following duties: -
1. Managed of Operation & maintenance for all power plants and base camp power generators.
2. Managed of Operation & maintenance for transmission lines, substations and all MV & HV switchgears.
3. Managed of Operation & maintenance for all scattered gen sets.
4. Managed of all contracts related to power system.
5. Planed and excutiting the implementation of new projects and FIPs related to power plant.
6. Managed and motivated employees to be productive and engaged in work.
.
7. Reviewed and approval all power plant shutdown and obtain management approval if required.
8. Monitored and improve production deferment due to power.
9. Monitored and update the load forecast.
1- Made plan for NEC in sales and losses
2- Co-ordinated and promote the involvement of all available functional directorate expertise in technology in improving the maintenance and operation of the Equipments. Process Improvement tools were used.
3- Ensured that all work plans are realistic and economically justified.
4- Organized human resources and work force required to achieve the goals.
5- Ensured Customer should satisfy NEC technical specification, connected properly
6- Connected the new customer on time
7- Collect the all energy sales and reduce the nontechnical losses to the standard
8- Improved the quality of the electricity
Student research guidance & counseling
ANSYS
Microsoft Office
System and separators,Wstfalia – Netherland
Working as a teamwork
PUBLICATIONS
Conference:
https://www.smart-energy.com/wp-content/uploads/Sudan’s%20Pre-paymentProject%20Success.pdf
Paper
Noise and Vibration in Boilers on High Loads
International Journal of Engineering Sciences Paradigms and Researches
http://ijesonline.com/47.php
Ph.D Thesis
Evaluation of Noise and Vibration in Boiler at high loads
http://respository.sustech.edu/handle/123456789/20704
Professional Memberships: Consultant Engineer, Sudanese Engineering Council (No.EC/ER/CE/733)
Fellow Member, Sudanese Engineering Society
BOOT system comprehensive program,
TQM Program, Cairo
Lotus Notes Operation, Khartoum
System and separators,Wstfalia – Netherland
Power Plant, Kima - German
Effect of Power Station in Environmental, Cairo
Budgeting Techniques, Khartoum
Introduction & Operation & Microsoft programs (excel, word, Project and power point), Khartoum